SPC lock floor installation method and precautions
SPC lock floor installation method and precautions SPC lock floor construction steps: The first step, before laying the SPC lock floor, make sure that the ground is flat, otherwise it must be self-leveling, and the ground must be dry and cleaned. The second step is to place the spc click lock flooring in the room temperature environment, so that the thermal expansion and contraction rate of the floor can be adapted to the laying environment. Generally, it is best to install it after 24 hours. You can also lay a layer of moisture-proof mat before paving. When paving, the paving should start from the corner of the wall, with the male tenon facing the wall, and generally follow the order of paving from the inside to the outside, and from left to right. Step 3: Insert the male groove of the end of the second spc click plank flooring into the female tongue groove of the end of the front floor at an angle of about 45 ° , and press...